Fire Systems of Texas LLC
  • Home
  • Project Highlights
  • Services
    • Overview
    • Design
    • Fabrication
    • Installation
    • Inspections
    • Repairs & Service
    • Fire Alarm
    • Consulting
  • Inspection Info & Request
  • Service & Maint. Request
  • Commercial Info & Request
  • FAQ
  • Educational Videos
Fire Systems of Texas LLC
  • Home
  • Project Highlights
  • Services
    • Overview
    • Design
    • Fabrication
    • Installation
    • Inspections
    • Repairs & Service
    • Fire Alarm
    • Consulting
  • Inspection Info & Request
  • Service & Maint. Request
  • Commercial Info & Request
  • FAQ
  • Educational Videos

Project Highlights

Haier Laredo

398,984 sq. ft. warehouse with  Steel Joists on Steel Girders.
10 ESFR systems fed by a 2,000 GPM @110 PSI Horizontal Split Case Electric Fire Pump. 

Pharr Aquatic Center

Firelines, FDC, and backflow preventer outside. Steel joists on steel I-beam construction covering 2 levels with swimming pools fed by a 2,000 GPM @110 PSI Horizontal Split Case Electric Fire Pump inside. 

Gelman Stained Glass Museum

Firelines, FDC, and backflow preventer outside.19,159 sq. ft. wood trusses on load-bearing walls construction.
A wet system covering multi-levels with attic coverage inside.

Pearl Point Apartments

Residential wood construction consisting of 9 Apartments - 3 floors each with clubhouse. CPVC pipe wet system throughout.

Carmax

Firelines, FDC, and backflow preventer outside. Steel Joists on Steel Girders construction with 4,780 sq. ft. sales floor, 29,076 sq. ft. service with paint booths, and 3,710 sq. ft. carwash inside. 

Bert Ogden Arena

Firelines, FDC, and backflow preventer outside. Steel on concrete construction. Multi-levels with Central Plant, Wet Standpipe System and 1,250 GPM @95 PSI Horizontal Split Case Electric Fire Pump with Automatic Transfer Switch inside.  

Driscoll Children's Hospital

Firelines, FDC, and backflow preventer outside. Hollow core pre-cast concrete planks on steel I-Beams construction.
8 -Story building with central plant comprised of wet systems, pre-action system, and standpipe system. 750 GPM @130 PSI Verticle In-line Electric Fire Pump with Automatic Transfer Switch inside. 

Mary Carrol High School

425,860 sq. ft steel with concrete construction education building.
9 Systems covering gymnasiums, photo lab, welding lab, cafeteria, science rooms, and others with a 1,000 GPM @ 60psi electric fire pump 

Brownsville Performing Arts Center

21,234 sq. ft. existing wood construction, retrofitted with wet sprinkler system coordinating with architectural features throughout. 

Nikki Rowe High School

Multiple Firelines, FDCs, and backflow preventers outside.Existing educational building with Natatorium, Gymnasium, ROTC, and Fine Arts building inside. 

  • Home
  • Project Highlights
  • Inspection Info & Request
  • Service & Maint. Request
  • Commercial Info & Request
  • FAQ
  • Educational Videos

Fire Systems of Texas LLC. - SCR-G-1867341

11500 North 10th Street, McAllen, Texas 78504, United States

956-391-1191

Copyright © 2025 Fire Systems of Texas LLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept